1. Project Management Process

1. Project Management Process
Module Completed Module In Progress Module Locked
1. Project Management Process 2074125  
  • Page
    Week 1: Lesson Introduction Week 1: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Management Framework.pptx Project Management Framework.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 1 Assignment Week 1 Assignment
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Discussion Topic
    LL Company - Case Study LL Company - Case Study
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #1 Class Project: Tip #1
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

2. Project Integration Management

2. Project Integration Management
Module Completed Module In Progress Module Locked
2. Project Integration Management 2074126  
  • Page
    Week 2: Lesson Introduction Week 2: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Integration Management.pptx Project Integration Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 2: Assignments Week 2: Assignments
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Discussion Topic
    Como Tool and Die - Case Study Como Tool and Die - Case Study
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #2 Class Project: Tip #2
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

3. Project Scope Management

3. Project Scope Management
Module Completed Module In Progress Module Locked
3. Project Scope Management 2074127  
  • Page
    Week 3: Lesson Introduction Week 3: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Scope Management.pptx Project Scope Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 3: Assignment Week 3: Assignment
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Discussion Topic
    Payton Corporation Payton Corporation
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #3 Class Project: Tip #3
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

4. Project Time Management

4. Project Time Management
Module Completed Module In Progress Module Locked
4. Project Time Management 2074128  
  • Page
    Week 4: Lesson Introduction Week 4: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Time Management.pptx Project Time Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 4: Assignment Week 4: Assignment
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Discussion Topic
    The Trophy Project The Trophy Project
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #4 Class Project: Tip #4
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

5. Project Cost Management

5. Project Cost Management
Module Completed Module In Progress Module Locked
5. Project Cost Management 2074129  
  • Page
    Week 5: Lesson Introduction Week 5: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Cost Management.pptx Project Cost Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 5: Assignment Week 5: Assignment
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #5 Class Project: Tip #5
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

6. Project Risk Management

6. Project Risk Management
Module Completed Module In Progress Module Locked
6. Project Risk Management 2074130  
  • Page
    Week 6: Lesson Introduction Week 6: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Risk Management.pptx Project Risk Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Week 6: Assignment Week 6: Assignment
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #6 Class Project: Tip #6
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

7. Project Procurement Management

7. Project Procurement Management
Module Completed Module In Progress Module Locked
7. Project Procurement Management 2074131  
  • Page
    Week 7: Lesson Introduction Week 7: Lesson Introduction
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Attachment
    Project Procurement Management.pptx Project Procurement Management.pptx
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Assignment
    Class Project Class Project
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
  • Page
    Class Project: Tip #7 Class Project: Tip #7
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete

8. Kitchen Remodeling Project

8. Kitchen Remodeling Project
Module Completed Module In Progress Module Locked
8. Kitchen Remodeling Project 2081571  
  • Page
    Week 8: CLASS PROJECT Week 8: CLASS PROJECT
    Score at least   Must score at least   to complete this module item Scored at least   Module item has been completed by scoring at least   Score at least  % Must score at least  % to complete this module item Scored at least  % Module item has been completed by scoring at least  % View Must view in order to complete this module item Viewed Module item has been viewed and is complete Mark done Must mark this module item done in order to complete Marked done Module item marked as done and is complete Contribute Must contribute to this module item to complete it Contributed Contributed to this module item and is complete Submit Must submit this module item to complete it Submitted Module item submitted and is complete
 
minimum score must view must submit must contribute